Business | Daily | Tourist
INFORMATION SERVICES

AZERBAIJAN – By participating in large-scale projects like the Southern Gas Corridor gas pipeline, “Greece improves its positioning and enhances its role in the international energy scene, becoming a ‘hub’ for Southeast Europe, as well as continental Europe,” Prime Minister Antonis Samaras said on Saturday in Azerbaijan.

Samaras addressed an international event marking the 20th anniversary of the Shah Deniz natural gas field agreements and the beginning of drilling for the Southern Corridor pipeline network. The events are also being attended by delegations from Turkey, Italy, Albania, Bulgaria, Montenegro, Croatia and UK.

The premier reviewed Greece’s progress in energy diversity, saying that Greece was expanding storage capacity at its LNG terminal in Revithoussa by 73% to 225,000 cubic metres, upgrading gasification speed by 40% and improving the country’s ports infrastructure. He also announced that “a second LNG terminal in northern Greece is also in the pipeline for the coming years.”

Also, he said, the 2nd International round of Concessions was under way, consisting of 20 blocks in the Ionian and Cretan Seas, while the contracts for the concession of 3 more blocks were recently concluded.

Speaking of the Southern Gas Corridor, Samaras lauded the project as “a factor of long-term stability, peace and global cooperation,” and one which Greece supported from the beginning.

“It is a vision of long-term cooperation among the countries and the people of such an extended region; indeed a model of global cooperation based on competitive prices which generate growth and promote environmental sustainability,” he said.

Natural gas will be transported from the Shah Deniz field in the Trans Adriatic Pipeline (TAP), which will pass Turkey, Greece and Albania to Italy; also being considered are links to other countries in the Balkan region through a vertical Greek-Bulgarian pipeline (IGB).

The TAP pipeline will have an initial transport ability of 10 billion cubic metres of gas annually, with the investment in the Greek part of the pipeline (with a length of 870 klm) totalling 1.5 billion euros. The project will create 2,000 direct and 10,000 indirect job positions. TAP’s shareholders are BP (20 pct), Socar (20 pct), Statoil (20 pct), Fluxys (16 pct), Total (10 pct), E.ON (9.0 pct) and Axpo (5.0 pct).

The post Samaras: Greek to be Energy Hub appeared first on The National Herald.

Source: The National Herald
Share it now!
More
Who We Are

GQS acts as an “information representative” providing a variety of accurate and authoritative analytics and responses About Greece. Our field of expertise ranges from simple Daily Life questions related to Tourism or the History of Greece, up to large Business related projects such as Economic Research, Human Resources Selection or Real Estate Services.

Find out more

Contact Us

Are you interested in obtaining any kind of information about Greece?

Let us help you!

If your requirements go beyond simple services and you want specialized information, you will receive a detailed email for any charges.

  • Weather

    Locations:
    Athens
    September 26, 2017, 5:21 pm
    Mostly cloudy
    Mostly cloudy
    26°C
    real feel: 27°C
    current pressure: 1020 mb
    humidity: 47%
    wind speed: 3 m/s S
    wind gusts: 3 m/s
    UV-Index: 1
    sunrise: 7:16 am
    sunset: 7:16 pm
     
  • Currency